| Canal failure: 25-10-2009 Causes of failure: Seepage and Insufficient Drainage @ Damaged Section |
![]() |
| We inspect the damage with Mr. C. Nkaka (Bricklayer). |
![]() |
| Mr. Lungu and Mr. Kapambwe start preparing the site. |
![]() |
| Repairs ~ 31-10-2009. Note Mr. E. Silwamba on the immediate left. |
![]() |
| 31-10-2009: Some water is allowed to pass through the channel |
![]() |
| 7-11-2009 Generation @ 6MW |
| Tempers cooled down from operations upon seeing this raw material. |
![]() |
| The completed structure complete with Gabion baskets 1-12-2009 |
| Generation at 18.5MW |