Mulungushi 10.5 MW No. 1 Machine Installation and Upgrade




New No.1 Machine (10.5MW)

Engineers Zulu, Kachasa, Chiti, Daka, Chibwe, Silwamba, Kamanga at Mulungushi Power Station during the installation of a 10.5MW turbine. The turbine replaced a smaller version (2.5MW) that was still in good working order during decommissioning. Total project cost was approx. $11m US (Funded by Development Bank of South Africa). Project commencement date : October 2007 ~ Completed November 2009



9/21/2007 ~ Engineer Q, Engineer Silwamba and Engineer Yande Simbule


MPS Turbine House Extension Works ~ Note the old #1 machine inside (yellow color).

Engineer Simbule and Q going through the blue prints.

Mr. Mwewa Mwape receiving the stator from the surface.


1/22/2008


3/7/2008


5/29/2008
The above 20Ton Stator en-route to the power house.

A site visit.

6/10/2008

Honorable Kambwili and Honorable Gary Nkombo ~ 6/10/2008

Toka on diversion dam. A real master of concrete.


5/29/2008
Old No.1 Rotor and shaft.

Decommissioned Old No.1 Penstocks (Pipes)

Engineer Chibwe and Engineer Zhang Kaiffei

Steel works on machine foundation.

Site inspection ~ 10/14/2008

Engineer Chibwe and Engineer Undi Henry Mtonga


Mr Sakwiba Sikota and Mr. Gary Nkombo ~ 6/10/2008

Engineer Chiti and Engineer Silwamba ~ 9/21/2007


Kurt of Metal Persuasions (SA) installing the crane beams.

The roller coaster ride. Engineer Chibwe seated.
The crane beams cross Nkhoma Bridge.


Old 36" No.1 pipe in anchor block.


Engineer Joseph Nyirenda of Zulu Burrow Ltd crossing the old #1 tail-race.





Engineer Katai Kachasa probing the old #1 tail-race ground.

Site meeting by Engineer Simbule with Q and others.

















A site visit by DBSA auditors as Mr. Chiti, Mutangama (Finance Manager - LHPC) and Engineer Chibwe listen in.
Mr. David Shamamba watching the crane beams being transported.

Engineers Chiti, Kamanga, Daka, Kachasa with Mr. Fang Shi and Sean ~ 9/27/2007





Engineers Chibwe, Kachasa, Chiti and Mr. Obrien Chisala at the Mulungushi Canal.







Engineer Lotti Nkhoma and Engineer Jacob Munthali at Nkhoma Bridge April 2007

Good times. Some bubble fish from Mulungushi canal.



David Silwamba's (my assistant) version of Pabwato.

A job well done.

Losses. Stolen from my shibukombe. May he who took this wonderful machine have a plague of boils for many years to come.

Zenaida Chongo, I had to put you in this. Regards to PC. My regards to Engineer Prosper Ngoma as well.







Mr. Damaseck Chirwa.



I am out... Napyamo!!! Bye