Search This Blog

Showing posts with label Mr. Misheck Daka. Show all posts
Showing posts with label Mr. Misheck Daka. Show all posts

Monday, October 10, 2011

Lunsemfwa Turntable ~ September 2011





Mr. P Ndesaula inspects the steel works.

Casting of Concrete.


Mr. Chiselela casting concrete.

Almost complete.

Complete with only minor changes to be done.

Mr. Ndesaula corrects the shaft to prevent unwanted contact with the winder rope.

Brother Misheck inspects the completed turn-table.



Sunday, September 25, 2011

Kapila Bridge Upgrade - MPS

Kapila Bridge ~ Shown with Deck Removed 16th October, 2007

Bottom Form-work

Mr. Tembo (a carpenter) & Me - At 69 years old, Mr. Tembo is still physically fit and he is among those first people who showed me the ropes when I came for industrial attachment while a student at CBU in 2005. 

Tying of Reinforcement Steel ~ 20th October, 2007

Form-work ~ Sides

The Completed Bridge ~ 27th October 2007

Many thanks to my site team and LHPC management.

Regards,

NMK

MPS - Mulungushi Power Station
LHPC - Lunsemfwa Hydro Power Co.





Proudly Zambian

Proudly Zambian
Born and Bred in Zambia, Central Africa, 10101

Pages